West Side Soffit Installation – Day 3

Day #126

June 6, 2020 – Continued from yesterday, the soffit installation goes up and down each gable rake on the west end of the cottage and around the corner to the south side.

West Side - Gable Rake
Soffit installation on the west side of the cottage.
Old Vent Opening
Framing in the old vent opening.

As I approach the roof ridge, I frame in, close up and cover the old vent opening with building wrap. In the photo below the soffit installation proceeds up the northern gable rake. The J Channel has been installed on the southern gable rake.

Old Vent Opening Closed
Old vent opening framed in and soffit J channel in place.

With the soffit done on the southern gable rake, the installation rounds the corner and continues on the south side of the cottage. This is existing overhang that for years, has been exposed with no soffit.

South Side Soffit
Soffit installation on the south side.

The soffit on two sides are is now complete. The south side will take a little longer as I have to work around the rhododendrons you see above. This will be tomorrows goal.