90 Percent Complete Floor Framing

Day #43

September 3, 2018 – Labor Day and boy did I ever. Today I finished the all of the porch addition floor joists. The floor framing is 90 percent complete. All that remains is two rows of solid bridging. This is next weekends project.

Here is a look back at the start of the floor framing.

Porch Addition - Floor Joist Framing
Porch addition floor framing continues.
Porch Addition - Floor Joist Framing
Temporary stairs and plywood decking at living room door.
Floor Framing 90 Percent Complete
The kitchen and porch addition floor framing is 90% complete.
Floor Framing 90% Complete
Sizing up the length of the porch addition. 64 feet!