Day #92
August 25, 2019 – After removing the “snake tarp” I reinstalled the old door frame, metal door and screen door. The temporary front door is inside the rough opening for the new sliding door.

I had to patch a small area of rotted wood on the threshold before I covered it with treated plywood. The threshold is a little high in the center so it will need some additional work before we put in the new door. Shouldn’t be to hard to level it out.

After the old door was reinstalled I closed in the remainder of the opening with exterior grade plywood and covered the area with Lowe’s building wrap. This will keep us dry and the temporary front door will keep us secure until the new door shows up.



Next weekend is the Labor Day Holiday weekend. Family and friends will be visiting so I’m not sure how much renovation we will get done. We always have a great time on Labor Day and I’m sure this holiday will be no different. Everybody drive safely and keep an eye out for the poe poe police.