September 29, 2019 – Rinse and repeat day two. The roof framing in section three continues with the installation of the second span roof rafters.

First I remove the top rows of oak roof planking to gain access to the ridge board. Next I connect the new roof rafters to the existing ridge board with galvanized rafter hangers. The hangers are Simpson Strong-Tie adjustable 2×8 hangers.

Existing Ridge Board - Rinse and Repeat Day Two
Removing top rows of oak roof planking to access the ridge board.
New Rafters - Rinse and Repeat Day Two
New rafters fastened to ridge board with galvanized hangers.

The opposite end of the second span rafter sits on the mid span knee wall. It is nailed to both the knee wall and the first span rafter.

2nd Span Roof Rafters
2nd span roof rafter sit on the mid span knee wall. Rinse and repeat day two.

Eleven rafters complete this section. As always, the last thing that needs done is placing the blue tarps to keep everything nice and dry until next weekend.

Section Three Roof Rafters
Porch roof section three roof rafters complete.
Porch Roof Section 3
Porch roof section three dried in for the weekend.

Next weekend I will install the plywood roof decking and cover this section with 30 lb. roofing paper. After that, it is on to the last section, section four. Hip Hip Hooray!