Day #79
July 12, 2019 – Today is another miscellaneous work day. I have hurricane ties, that I purchased from Fasteners Plus, to install on the first porch roof section. Thankfully, I made it all the way to the cottage with the three new windows without any breakage…so there’s that. Before I can continue anymore Trex decking I have to install the drain line for the kitchen sink.
First up, the Hurricane Ties. They are easy to install and help prevent lateral movement and uplift from strong winds.

I was able to unload the windows buy myself without breaking anything.

After the hurricane tie installation and the window unloading I started the drain line installation. I did a quick take off of the material and headed out to Lowe’s to purchase what I needed.

Back at the cottage I started the drain line. I am basically working between two fixed points. The underside of the floor framing at the kitchen addition, and the existing tie in under the bathroom. I began by putting in the drop at the kitchen sink.

With the drop in place, I cut aligned and glued an elbow at the tie in.

Working between these two points I laid out and blocked up the pipe to the proper pitch. I was hoping to get 1/4″ per foot slope but I was only able to get the minimum, an 1/8″ per foot.
At this point I was running out of daylight so I decided to complete the drain line tomorrow, in the morning.