Day #21
July 7, 2018 – Up early this morning. Double checking all the footers, putting in grade stakes for the concrete elevation and de-watering where necessary. Checked the inflation on the wheel barrow tires and we are all ready for the concrete pour.
Had a little coffee time before the concrete truck rolled in at about 7:30 AM.
Everyone took turns on the wheel barrows and we had 2.75 yards placed in the 19 holes in about 25 minutes. Not too bad. The yardage worked out perfectly.
After we cleaned up it was off to Shy Bear Brewery for a celebration dinner.
After we cleaned up it was off to Shy Bear Brewery for a celebration dinner.
The new addition is well underway! Tomorrow I think we will take a break.