Day #110
November 02, 2019 – Back after a few weekends off. I’ll be framing the 2nd span of rafters in the last roof section. First I remove the temporary weather protection (blue tarps) to expose the old roof planks.

With the tarps removed I begin cutting and removing the top 7 or 8 rows of the oak roof planking. This gives me access to the existing ridge board.
After I have access to the existing ridge board I can install the galvanized joist hangers and begin setting the 2nd span roof rafters.

The process of roof plank demo, hanger installation and rafter setting continues until I reach the end of the new porch roof. After the last 2nd span rafter is set into place I drop back and nail everything up.


This gets me to the end of the day. No rain is expected tonight so I can get away with just a few tarps to cover over the roof. Tomorrow I’ll be installing the new plywood sheathing on the last roof section. We are getting closer to the metal roof installation!